Golden Silo

Depths of Salvation

Golden silo is the first “NEW” drain that we as a group have first publicly documented, it was built sometime between April of 2023 and was completed march of this year. It futures a smaller sized pipe of 1800mm. It seems to be done for construction, although when we went down we found plastic bottles and cola cans meaning that workers were down there recently. It contains mostly mud and lends to a cute golden silo (Wolverine pissed of the top of it and almost hit me and my camera). Finally at the end were the silo is there is a smaller pipe with flowing water that leads somewhere else, although we couldn’t get through.

Info

LocationToronto, ON
Size/Type1800mm-65 D pipe
Drain TypeStormwater
Lengthunknown
FeaturesMicrotunneling TBM launch shaft
AOTUR Rating7/10
Discovered ByDAexplores
First Documented ExplorationAOTUR

Latest Trip